The Slovenian electricity feed-in support scheme for RES (renewable energy source) and CHP (high-efficiency cogeneration) power plants in 2014 included 3767 power plants with a combined installed capacity of 516 MWe. Among the 348 there were 205 new entrants, with a combined installed capacity of 23.942 kWe. The structure by type is as follows: 98 were solar PV plants (8.907 kWe), 87 fossil-fuel high-efficiency CHP (8.835 kW). Detailed overwiev is available here.